TASS: Russia to Build Network of 11 Transport and Logistics Centers

9 July 2024

The FinInvest Group plans to develop a core network of 11 rail transport-logistics centers (TLCs) totaling over 5.65 million TEU (twenty-foot equivalent units for standard 6-meter containers) capacity per year in various Russian regions. Project investments are valued at 120 billion rubles, announced FinInvest owner Alexander Kahidze to TASS.

"We aim to build a backbone network of 11 TLCs with aggregate capacity exceeding 5.65M TEU annually. With cargo flows shifting east, these privately invested modern TLCs support national objectives to increase freight volumes on constrained Eastern polygon stretches. Advanced multimodal logistics hubs represent capital-intensive ventures," Kahidze explained.

Construction will proceed over the next few years, with centers positioned from central Russia to the Far East. Four are already operational in the Central transport node, Sverdlovsk Oblast, and Novosibirsk Oblast. Upcoming sites in Primorsky Krai and Kemerovo Oblast will enhance container outflows of imports from Far East ports.

"Phase two of one million-TEU facility—the Siberian TLC—opens July 2024, with full commissioning in 2025. Artem TLC accepts its first container train in 2024 as the Far East's premier dry port. Phase one crane tech launches 2025 at Artem, surpassing 1M TEU/year capacity," he added.

Источник

Get a consultation
Contact us in one of the offered ways
By phone